The project will provide heavy preventative maintenance along 1.25 miles of roadway from Lackman Road to Noland Road. Portions of the pavement, stormwater system and street lighting within this corridor have deteriorated and require repair or replacement. This preventative maintenance will extend the life of the roadway and prevent more significant deterioration.
The project will include an asphalt mill and overlay, new pavement markings and replacement of a small section of street lighting. Spot repairs will be made to deteriorated sidewalks, trails, and curb and gutter. Stormwater pipe replacement and lining will be completed at multiple locations.
February 2026: The project is currently under design. Construction is scheduled for summer 2026.